Project Plan
DAKCHALIOU 2 HYDRO POWER PLANT
- by Super User
-
Hits: 991
The Dakchaliou II HHP is expected to locate on Nam Pa Gnou river and its tributary stream in the vicinity of Dakchung district Sekong province. Dam site will be constructed at location where is about 20 Km from Dakchung district and 10 Km far from Vietnam- Lao border into the west, 120 Km from Sekong Province into the northeast in the route. The project is expected to construct at site between Sekaman 3 Damsite and power house . It is geographical coordinates are within: 15°24'16.80"to15°25'11.48"Northern latitude and107°24'42.88"to107°25 '22.56"longitude The catchment area of Dakchaliou II at dam site is 125 Km2. Normal water level is 685 m and dead water level is 681m. Area of reservoir surface confirming to NWL is 0.049 Km2.
Installed capacity : 13 MW
Annual average energy output : E0 = 51.823 x 106 KWh
Turbine type : Francis
Number of units : Z = 2 units
FIRR : 12.95%
EIRR : 11.96 %
Payback period : 8-11 years
Total investment cost estimate : 25,413,000 USD
Comments
- No comments found
Leave your comments