Nam Pagnou river is the 1st graded branch on the right bank of Sekaman rivre and is the 2nd graded branch of Sekong river. It is expected to locate on Nam PaGnou river in the vicinity of Dakchung District, Sekong province. Dam site will be constructed at location where is about 7 Km far from Vietnam- Laos border into the west, 65 Km from Sekong Province into the northeast by Air line or about 100 Km in the route. And 20 Km far from Sekaman 3 Damsite on the upstream side by waterway.It is geographical coordinates are within: 15°32'12" Northern Latitude and 107°18'26" longitude The catchment area of Nam Pagnou at dam site is 446.5 Km2. Normal water level is 1064 m and dead water level is 1053 m. Area of reservoir surface confirming to NWL is 2.53 Km2.
Installed capacity : 33 MW
Annual average energy output : E0 = 135.09 x 106 KWh
Turbine type : Francis
Number of units : Z = 2 units
FIRR : 11.07%
EIRR : 13.57 %
Payback period : 15-16 years
Total investment cost estimate : 49.827 Million USD
Comments
- No comments found
Leave your comments